Logo
Axies Ventures

Project highlights

New copper-gold zone discovered in 2024. Followed-up with diamond drilling in 2025 confirming an interval of 0.5% Cu over 72m, including 0.75% Cu over 32m and mineralised from surface.

Highly-prospective regional zone with gossan outcrops along a 12km structural corridor.

Estimated up to 13.9Mt of mineralised waste dumps showing grades of up to 1.7g/t gold. Dumps in close proximity to historic mine.

3 successful drilling campaigns completed, including both RAB and diamond drilling.

Gallery