Project highlights
New copper-gold zone discovered in 2024. Followed-up with diamond drilling in 2025 confirming an interval of 0.5% Cu over 72m, including 0.75% Cu over 32m and mineralised from surface.
Highly-prospective regional zone with gossan outcrops along a 12km structural corridor.
Estimated up to 13.9Mt of mineralised waste dumps showing grades of up to 1.7g/t gold. Dumps in close proximity to historic mine.
3 successful drilling campaigns completed, including both RAB and diamond drilling.