Logo
Axies Ventures

Project highlights

Phase 1 Exploration Programme completed in May with a follow-up in July 2023. Results include up to 2.3% Cu assay results and multiple points of interest for further investigation.

Phase 2 follow-up soil sampling completed in September 2023 identified the continuation of a mineralised 1.5km trend.

Phase 3 rock-chip and sediment sampling returned results up to 6.44% Cu, reaffirming the target as our flagship Canadian asset.

Anomalous float clusters in Area 1 (western portion), paired with the anomalous Cu-in-soil trend, suggest a previously unknown copper-bearing zone with a significant strike length of at least 800 metres.